Huge Robbins Slurry TBM makes the Cut

October 10, 2018

Hiroshima Heavyweight Launches on Expressway Line 5 On September 18, 2018, a Robbins mega-sized slurry machine, measuring 13.7 m (44.8 ft) in diameter, made its first cut into hard rock. The epic launch at an urban jobsite was… Continue reading

McLaughlin Adds Application Engineer, Neville Missen

September 25, 2018

Missen brings over 25 years experience to the position GREENVILLE, S.C. — September 24, 2018 — McLaughlin Group, Inc. continues to grow its expertise in the underground construction industry with the addition of Neville Missen, an industry veteran who… Continue reading